AEG 21604 G Instrukcja Użytkownika Strona 493

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 651
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 492
F-252
Other information
Subsequent events
In October 2010 the Company guaranteed a new bank bond facility of one of its subsidiaries. The maximum
potential contingent liability of the Company under such guarantees, including those in existence at 30 Septem-
ber 2010 (see note 9), was 30,172,000. The actual amount drawn on these facilities and hence the actual con-
tingent liability of the Company at the end of October 2010 was € 16,473,000.
Subsidiaries
AEG Power Solutions B.V. (formerly 3W Power Holdings and Power Supply Systems Holdings (The Nether-
lands) B.V. respectively) has subsidiaries as detailed in note 2.
Przeglądanie stron 492
1 2 ... 488 489 490 491 492 493 494 495 496 497 498 ... 650 651

Komentarze do niniejszej Instrukcji

Brak uwag